Type B Fire Safety Statements on your terms.
The Checklist
What we require in order to prepare a Fire Statement:
Information
- Project identification name and address. 
- Brief project description. 
- Identity by name of client (as per planning application). 
- Identity of architect, planning consultant and approved inspector (if applicable). 
- Total floor area of proposed development, and floor area per storey. 
- Confirmation as to whether Policy D12(B) applies. 
- Height to topmost floor as measured above lowermost ground level 
- Area of basement storey and its depth below ground level (if applicable) . 
- No. of flats (if applicable). 
- Planning classes for each non-residential part. 
- Narrative description of materials to be used in construction of building, including specifically structural frame and roof. 
- Narrative description of materials to be used in construction of external walls. 
- Single page PDF schedule of relevant drawings. 
Drawings
- Site Location Plan (to include local public highways sufficient to show fire appliance access to site from public highways) with site’s legal boundary clearly identified. 
- Site Location Plan to include local public hydrant(s). 
- Site Layout Plan annotated with distances from each building elevation to legal boundary. 
- Site Layout Plan to include identification of all site roadways/pathways to allow confirmation of Fire Service circulation routes (must include a scale bar). 
- Site Layout Plan to include Evacuation Assembly Point 
- Floor Plans of all floor levels (must include a scale bar) – single multi-page PDF file 
- Elevations (must include a scale bar) – single multi-page PDF file only 
- Cross-section capturing tallest floor level (must include a scale bar) 
